Alternate Text

Our mobile charging aggregate combines the charging station and the battery energy storage and integrates them into a single unit. It has a light weight and a compact size, and specifically designed and customized according to the Swedish traffic regulation to fit into a mobile usage. It is made for the Nordic weather conditions with very good corrosion protection. It is easier to move around with a fork lift or a crane, and gives strong protection against any possible collision. It is free of installation with good mobility.

When the mobile charging aggregate is being used for charging when it is connected to the power grid, it can help you to get a power output much bigger than the power output from the power grid. Since the charging stations are not being used for charging all the time, the energy supply from the grid can be stored in battery so that you can output the energy at a much higher power into the electric vehicles and machineries. You fulfill your need with a power connection at a much lower rate from the grid. It takes time to apply for a power connection from the electric grid, and you normally do not get the power rate that you want because of shortage in local distribution and local electricity supply. You also need to pay for a higher power connection while a much lower connection is enough based on our energy aggregate solution.


chargingaggregate.png

Application scenario

Picture1.png

Product models


CA150

CA250

CA500

Battery capacity

156kwh

261kwh

522kwh

Rated power

80kw

125kw

250kw

Depth of discharge

≤95%

≤95%

≤95%

Cycles

>8000

>8000

>8000

Cell type

3.2V/314Ah(LFP)

3.2V/314Ah(LFP)

3.2V/314Ah(LFP)

Battery module setup

1P52S

1P52S

1P52S

Battery system setup

1P156S

1P260S

2P260S

Rated voltage

499V

832V

832V

Maximum charging voltage

555V

949V

949V

Cut-off discharging voltage

390V

650V

650V

PCS rated power

100kw

100kw

100kw

Input voltage AC

3~ 400VAC

3~ 400VAC

3~ 400VAC

Input frequency AC

50/60 Hz

50/60 Hz

50/60 Hz

Input connector AC

CEE 3~, 63A

CEE 3~, 63A

CEE 3~, 125A

Input connector DC

CCS2

CCS2

CCS2

Output connector AC

CEE 3~ 126A, 63A, 32A; CEE 1~ 16A

CEE 3~ 126A, 63A, 32A; CEE 1~ 16A

CEE 3~ 252A, 126A, 63A, 32A; CEE 1~ 32A

Output power AC

80kw

80kw

160kw

Installation

mobile

mobile

mobile

IP rating

IP 54

IP 54

IP 54

Operating temperature

-35°C ~ +55°C

-35°C ~ +55°C

-35°C ~ +55°C

Cooling method

liquid cooling

liquid cooling

liquid cooling

Noise

 50 dB

 50 dB

 50 dB

Relative humidity

5% ~ 95%

5% ~ 95%

5% ~ 95%

Network connection

4G, Wi-Fi, Ethernet

4G, Wi-Fi, Ethernet

4G, Wi-Fi, Ethernet

Enclosure

Cabin

Cabin

Cabin

Dimension

1500x1500x1600cm

1500x1500x2100cm

1500x2000x3000cm

Weight

1900kg

2500kg

3500kg

Safety and protection

Over and under voltage protection, overload protection, current leakage protection, over temperature protection

Over and under voltage protection, overload protection, current leakage protection, over temperature protection

Over and under voltage protection, overload protection, current leakage protection, over temperature protection

Charging features

Output connector DC

CCS2

CCS2

CCS2

Output power DC

100kw

160kw

280kw

Output voltage for DC

150~1000VDC

150~1000VDC

150~1000VDC

No of charging pistol

1

1

2

Cable length

5 meter

5 meter

5 meter

HMI

7-inch touch screen

7-inch touch screen

7-inch touch screen

Charging mode

Automatic full, fixed amount, fixed time

Automatic full, fixed amount, fixed time

Automatic full, fixed amount, fixed time

Payment method

Payment terminal, RFID card, Scan code, APP, VIN code

Payment terminal, RFID card, Scan code, APP, VIN code

Payment terminal, RFID card, Scan code, APP, VIN code

Communication protocol

OCPP 1.6J

OCPP 1.6J

OCPP 1.6J

Other features

Visualized charging progress display,

Anti-corrosion galvalume housing

Visualized charging progress display,

Anti-corrosion galvalume housing

Visualized charging progress display,

Anti-corrosion galvalume housing


Application

battery bank — 2025-05-13

odor removal — 2020-07-30

odor removal — 2020-07-30

Internal Dust Cleaning — 2020-07-30